The plan got approved. Then it stopped being true.
Your HMP was current the day it was adopted. Hazzard keeps the risk picture behind it alive — every hazard, finding, and mitigation action cited to its source and current between plan cycles.
The 5-year clock never stops
An expired HMP pauses HMGP, BRIC, and FMA eligibility. The update takes 18 months — the calendar doesn't care that you're also running exercises and real incidents.
The risk picture lives in eight places
HMP, EOP, THIRA/SPR, flood studies, consultant PDFs, GIS layers, and staff memory. Reassembling it before every grant application is a job nobody budgeted.
“Where did this number come from?”
A FEMA reviewer, a council member, or a grant panel asks — and the answer is buried in a 400-page PDF adopted years ago, if it exists at all.
Define the footprint risk actually follows
Jurisdictions, county-wide declarations, and the watched places outside your boundary — the upstream dam, the neighboring county's wildfire fuel — whose failures land on you.
- JurisdictionPrimary
City of Lone Tree
Municipal boundary
- WatchedExternal
Douglas County
Adjacent — upstream flood & dam context
- LocationConfirmed
Water Treatment Plant #2
Critical facility
- LocationConfirmed
Civic Center Campus
Government operations
- TerritoryResolving
North Service District
Service territory — spans 2 jurisdictions
Turn the plans you already paid for into data
Upload the HMP, the EOP, the studies. Every extracted finding stays tied to its source page, date, and method — extracted information never silently becomes truth.
- 38 findings
2019 Douglas County Hazard Mitigation Plan
PDF · 214 pp · county scope · data vintage 2018
- Processing
THIRA / SPR 2023
PDF · regional scope · uploaded today
- Queued
Chatfield Dam Emergency Action Plan
PDF · restricted · external jurisdiction
- 12 findings
Wildland-urban interface assessment
Consultant report · 2021 · city scope
Keep the risk inventory current and defensible
Hazard suggestions seeded from national data for your exact counties, decided by your team, established by an authorized approver — with the audit trail FEMA review expects.
- Established
Earthquake
aka seismic hazard, ground shaking
- Established
Wildfire
wind-driven · WUI exposure · smoke
- Needs review
Burnscar Flooding
cascading from wildfire burn scars
- Watched
Dam Failure
external — Chatfield Dam, Douglas County
- Proposed
Ice Jam Flooding
suggested from state plan overlap
Your next plan cycle starts from data, not a blank page.
Create your organization, define your footprint, and seed your hazard list from national data in about ten minutes.