How it works

See how a hazard gets onto the record.

Your documents in, a cited draft, your team’s decision, a second person’s sign-off if you want one, and a brief that shows its work.

  1. Model

    Cited draft

    Written only from the facts you kept, every sentence footnoted.

    generation_requested

  2. Planner

    Accepted

    Accept it, edit it, or write your own. Each version is kept.

    basis_accepted

  3. Planner

    Score proposed

    A 1–5 score, with a note if it differs from the suggestion.

    proposed

  4. Second reviewer

    Approved

    Someone other than the proposer signs off.

    approved

  5. The record

    On the record

    Score, reasoning, suggestion and both names, for good.

    assessed

Each step writes the audit event under it. Screens show Cedar Ridge County, a fictional example. People appear by role, not by name.

1 · Bring what you have

Start with the plans already on your shelf.

Upload the plans, annexes and after-action reports you already have. Hazzard reads every page and keeps each document’s history: replace a plan and the new version waits as a candidate while the old one stays on the record.

  • Hazard mitigation plans
  • THIRA / SPR and HVAs
  • Emergency operations plans
  • Flood, wildfire and seismic studies
  • Facility, GIS and asset inventories
  • Consultant work products
hazzard.ai/o/cedar-ridge-county/library

Library

Add documents
  • Cedar Ridge County Hazard Mitigation Plan

    Hazard mitigation plan · 412 pages

    Read
  • Cedar Ridge Community Wildfire Protection Plan

    Wildfire protection plan · 96 pages

    Read
  • Pine Hollow Fire After-Action Report

    After-action report · 38 pages

    Read
  • County Emergency Operations Plan

    Emergency operations plan · 184 pages

    Reading

2 · Your hazard list

Hazzard suggests. You decide which hazards count.

Every hazard in the taxonomy arrives as a suggestion, with the evidence your documents hold for it. Nothing is on your list until a person includes it, and the list is only established once every hazard has been decided.

hazzard.ai/o/cedar-ridge-county/threats

Threats & hazards

2 included · 2 to decide · 1 excluded

  • Wildland Fire

    Included
  • Riverine Flooding

    Included
  • Winter Storm/Heavy Snow

  • Ransomware

  • Tsunami

    Excluded

The list can be established once every hazard is decided.

3 · The cited draft

The draft is cited. Accepting it is your call.

For each of likelihood, impact and readiness, the model drafts a justification from the facts you kept, and every sentence is footnoted to its page. Accept it, edit it, or write your own. Each accepted version is saved, and you can roll back.

hazzard.ai/o/cedar-ridge-county/risks/wildland-fire/likelihood

Wildland Fire · Likelihood

Draft · from 3 facts you kept

The county fire district recorded 64 wildland fires from 2010 through 2024, most under one acre; the largest, the 2018 Pine Hollow Fire, burned 1,240 acres.1 The 2022 wildfire protection plan maps 18,400 acres of wildland–urban interface along the western foothills, with about 3,100 homes within half a mile of continuous fuels.2

1 · Pine Hollow Fire After-Action Report, 2018, p. 4

“Between 2010 and 2024 the District responded to 64 wildland fires, the majority of which burned less than one acre. The Pine Hollow Fire of August 2018 burned 1,240 acres.”

4 · The score

A number needs a reason, and a second person if you want one.

A score can’t be set until a justification is accepted. When your number differs from the draft’s suggestion, it needs a line on why, and both go on the record.

Your organization chooses how many approvals a score needs: none, one, two or three. With approvals on, a score is a proposal until someone other than the proposer signs off.

hazzard.ai/o/cedar-ridge-county/risks/wildland-fire/likelihood

Likelihood: suggested 4, scored 3

Without a reason

1 check must pass first

3 of 4 passed

  • Justification accepted. Version 2 is on record for this dimension.

  • Evidence cited. The justification cites 3 sources.

  • Differs from the suggestion. Your score (3/5) differs from the suggested 4/5 — add a line on why, so the record carries your reasoning.

  • Justification is current. No new facts since it was accepted.

With a reason

All checks passed

4 of 4 passed

  • Justification accepted. Version 2 is on record for this dimension.

  • Evidence cited. The justification cites 3 sources.

  • Differs from the suggestion, with a reason. Suggested 4/5, chose 3/5 — your note is on the record.

  • Justification is current. No new facts since it was accepted.

Proposed by Planner· waiting on 1 approval

“Fuel treatments on 2,300 acres since 2022 lower the likelihood below the suggested 4.”

Deputy chief reviewing — the proposer can’t approve.

5 · The record

Every step is on the record, for good.

Uploads, decisions, accepted drafts, proposals and approvals each write an audit event: who, when, what changed, and what it replaced. Nothing in that history can be edited or deleted.

  • Consultants get scoped access, not your login. A partner grant is read-only, limited to named surfaces, granted when work starts and revoked when it closes. It is not a role, so nobody becomes a member of your organization to do a study.
  • Every consequential action is on the record. Hazard decisions, approvals, uploads, access grants and re-runs all write an audit event. The table is append-only: no update path, no delete path, no exceptions.
  • One document, however many jurisdictions hold it. Documents are addressed by content, so a regional plan shared across member towns is one document with many claims on it. Release the last claim and it is gone; release yours and everyone else's stays.
hazzard.ai/o/cedar-ridge-county/risks/wildland-fire/record

Wildland Fire · Record

  1. Deputy chiefapprovedSep 14, 10:42

    Likelihood 3 — approval 1 of 1. The score is on the record.

  2. PlannerproposedSep 14, 09:15

    Likelihood 3 (suggested 4): “Fuel treatments on 2,300 acres since 2022…”

  3. Plannerbasis_acceptedSep 13, 16:03

    Likelihood justification, version 2, 3 citations.

  4. Plannerfact_decidedSep 13, 15:58

    Kept: “64 wildland fires from 2010 through 2024…” (C, p. 4)

  5. Emergency managerdecidedSep 12, 11:20

    Wildland Fire included on the hazard list.

  6. PlanneruploadedSep 10, 08:31

    Pine Hollow Fire After-Action Report (38 pages).

Append-only: there is no update path and no delete path for this history.

6 · The brief

One brief per hazard, ready for your council.

When all three dimensions are scored, the hazard’s brief is ready: the reading, the accepted reasoning with its footnotes, the federal record and every document it cites. Print it, or save it as a PDF.

Where this brief sitsBrowse the taxonomy →
  1. 73 hazards & threats · 13 categories

  2. Wildfire · 3 items

    • Wildland Fire
    • Wildland-Urban Interface Fire
    • Grassland / Prairie Fire
  3. Evidence brief

    Wildland Fire

    Cedar Ridge County (example)

    L3 · I4 · R3

Evidence brief for Cedar Ridge County (example)

September 14, 2026

Wildland Fire

Hazard in Wildfire, on the established threats & hazards list

Impact
5432112345

Likelihood

Likelihood
3

Possible — Expected occasionally — roughly once in 10 to 50 years (2–10% chance in any year).

Impact
4

Major — Severe effects — casualties possible, serious damage across a significant share of the jurisdiction, essential services disrupted for weeks, outside assistance needed.

Readiness
3

Moderate — The organization has a generally established capability to manage this threat or hazard, but identifiable gaps remain. The organization could likely perform many required actions, though effectiveness may vary depending on conditions, staffing, resources, or complexity.

  • 3source documents
  • 148verified mentions
  • 2federal declarations
  • 91.6NRI score, relatively high

Worked example: Cedar Ridge County is fictional. The scores illustrate the format and are nobody's decision.

Book a walkthrough

Bring your documents. Leave with a cited brief for your biggest hazards.

Send us your public documents and we’ll set things up before your call. We’ll guide you through the process and you’ll get a useful summary to keep, even if you don’t work with us.

  1. Tell us about your project

  2. We prepare from public data before we meet

  3. You leave with a cited brief for one hazard

Already have an account? Sign in

Request a walkthrough

Takes about two minutes. A person reads every request.

Define your footprint on the map first